Passenger and freight train ramp tracking operation control method, device and equipment and medium
The invention provides a passenger and freight train ramp tracking operation control method, device and equipment and a medium, and relates to the technical field of intelligent traffic, and the method comprises the steps: determining the maximum operation time and the minimum operation time of a pa...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
19.09.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a passenger and freight train ramp tracking operation control method, device and equipment and a medium, and relates to the technical field of intelligent traffic, and the method comprises the steps: determining the maximum operation time and the minimum operation time of a passenger train passing through a target ramp based on the current speed of the passenger train and a preset ramp control strategy; under the condition that it is determined that the first planned operation time of the passenger train passing through the target ramp exceeds the time range formed by the maximum operation time and the minimum operation time, the first planned operation time and the first planned operation speed of the passenger train passing through the target ramp are adjusted; and controlling the passenger train to run on the target ramp based on the adjusted first planned running time and first planned running speed, and determining the lowest ramp pilot speed for providing running strategy guidance |
---|---|
Bibliography: | Application Number: CN202310679053 |