Rapid construction method for steel structure building

The invention discloses a rapid construction method for a steel structure building, a full-length steel column is adopted as a steel column, an externally-wrapped rigid connection column is formed during site construction, and the construction comprises the following steps: after a bearing platform...

Full description

Saved in:
Bibliographic Details
Main Authors XIAO BIN, ZHANG PENG, LUO ZHI, SUN YIHAI, SONG ZIJUN
Format Patent
LanguageChinese
English
Published 25.08.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a rapid construction method for a steel structure building, a full-length steel column is adopted as a steel column, an externally-wrapped rigid connection column is formed during site construction, and the construction comprises the following steps: after a bearing platform is poured and before the steel column enters the site, a first brick blank film is built at a specified distance away from the foot edge of the externally-wrapped rigid connection column; mechanical backfilling operation is conducted on the periphery of the first-time brick blank film, and meanwhile a temporary road is laid; a crane enters the yard, and correction is conducted after first-layer and second-layer steel structure beam plates are hoisted; tightening foundation bolts between the lower ends of the steel columns and the bearing platform; a secondary brick moulding bed is built on the foot edge of the externally-wrapped rigid connection column; the area between the two brick blank molds is manually backfil
Bibliography:Application Number: CN202310535449