Blasting excavation construction method for shallow-buried unsymmetrical-pressure large-span multi-arch tunnel without middle pilot tunnel
The embodiment of the invention provides a blasting excavation construction method for a shallow-buried unsymmetrical-pressure large-span multi-arch tunnel without a middle pilot tunnel, and relates to the field of tunnel construction. The blasting excavation construction method for the shallow-buri...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
22.08.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The embodiment of the invention provides a blasting excavation construction method for a shallow-buried unsymmetrical-pressure large-span multi-arch tunnel without a middle pilot tunnel, and relates to the field of tunnel construction. The blasting excavation construction method for the shallow-buried unsymmetrical-pressure large-span middle-pilot-tunnel-free multi-arch tunnel comprises the steps that a shock insulation layer is arranged between a secondary lining and a primary support of a preceding hole to improve the shock absorption capacity of the preceding hole; a plurality of blasting shot holes are formed in the posterior hole, and the blasting shot holes are detonated to conduct blasting construction on the posterior hole for multiple times; setting a plurality of monitoring points in the posterior hole, obtaining monitoring data of the plurality of monitoring points, and obtaining a vibration change curve of the posterior hole according to all the monitoring data; and according to the vibration chan |
---|---|
Bibliography: | Application Number: CN202310535035 |