Method for judging that 110kV main transformer does not meet N-1 in consideration of 10kV transfer
The invention relates to the field of power systems, in particular to a method for judging whether a 110kV main transformer does not meet N-1 in consideration of 10kV transfer, which comprises the following steps of: checking whether a 110kV transformer substation meets the requirement of short-time...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
18.08.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to the field of power systems, in particular to a method for judging whether a 110kV main transformer does not meet N-1 in consideration of 10kV transfer, which comprises the following steps of: checking whether a 110kV transformer substation meets the requirement of short-time overload capacity of the main transformer after the N-1 of the main transformer, if the 110kV transformer substation meets the requirement of short-time overload capacity of the main transformer after the N-1 of the main transformer, determining that the transformer substation meets N-1, and if the 110kV transformer substation meets the requirement of short-time overload capacity of the main transformer after the N-1 of the main transformer, determining that the transformer substation meets N-1, otherwise, determining that the transformer if the 110kV transformer substation does not meet the requirement of the short-time overload capacity of the main transformer after the main transformer is N-1, checking the 10kV |
---|---|
Bibliography: | Application Number: CN202310476710 |