Large-span high-speed railway steel-concrete composite beam cable-stayed bridge girder linear one-time forming high-precision construction method

The invention discloses a large-span high-speed railway steel-concrete composite beam cable-stayed bridge girder linear one-time forming high-precision construction method which comprises the following steps: S1, establishing a bridge construction control finite element model, the determined manufac...

Full description

Saved in:
Bibliographic Details
Main Authors ZHOU RENZHONG, WU XIAODONG, WENG FANGWEN, LUO CHANGWEI, ZHENG JIANXIN, MU WENJUN, HUANG CAN, ZHU HAO, LIU YANG
Format Patent
LanguageChinese
English
Published 15.08.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a large-span high-speed railway steel-concrete composite beam cable-stayed bridge girder linear one-time forming high-precision construction method which comprises the following steps: S1, establishing a bridge construction control finite element model, the determined manufacturing geometric parameters comprise the unstressed length L0 of the inhaul cable, the compression compensation amount L1 of a side span steel beam, the compression compensation amount L of the length L of a middle span steel box beam, a main tower pre-lifting beam H and the pre-throwing amount D when a main beam is erected; s2, steel box girders and stay cables are manufactured and machined according to geometric parameters, a concrete main tower is constructed, steel-concrete composite beams are erected, and midspan closure is conducted; s3, second-stage pavement is constructed, and at the moment, the line shape of the main beam is a finished bridge line shape; and S4, the finished bridge line shape and cable for
Bibliography:Application Number: CN202310400214