Method for predicting productivity of fractured oil and gas reservoir
The invention discloses a method for predicting the productivity of a fractured oil and gas reservoir. The method comprises the steps of 1, collecting data and constructing a sample data set; step 2, initial stress displacement condition; 3, fluid pressure in the initial crack is calculated; 4, the...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
04.08.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a method for predicting the productivity of a fractured oil and gas reservoir. The method comprises the steps of 1, collecting data and constructing a sample data set; step 2, initial stress displacement condition; 3, fluid pressure in the initial crack is calculated; 4, the construction time is calculated through a mass conservation equation; 5, deploying natural fractures, and judging the activation condition of the natural fractures when the hydraulic fractures extend to the natural fractures; 6, if the result time obtained in the step 3 does not reach the construction design time, returning to the step 1 for recalculation; if the construction design time is reached, exporting hydraulic fracture parameters, natural fracture parameters and stratum parameters to a. Xlsx file; seventhly, a fracture network formed after hydraulic fracturing when on-site natural fractures exist is reduced; and 8, carrying out iterative solution by combining a Darcy seepage equation and a water storage mo |
---|---|
Bibliography: | Application Number: CN202310288638 |