Open pit filling method
The open-air pit filling method comprises the following steps that a filling pipeline extends into an open-air pit; filling a filling layer with the thickness smaller than a first preset value in the open pit with filling slurry through the filling pipeline so as to form a filling body in the fillin...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
04.08.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The open-air pit filling method comprises the following steps that a filling pipeline extends into an open-air pit; filling a filling layer with the thickness smaller than a first preset value in the open pit with filling slurry through the filling pipeline so as to form a filling body in the filling layer; the open pit is sequentially filled from bottom to top, and a plurality of filling bodies stacked in the vertical direction are formed; wherein in the process of forming each filling body, a water collecting pit is formed in each filling layer, and after water in the water collecting pits is drained through a drainage device, the water collecting pits are filled with filling slurry. Therefore, the open-air pit filling method has the advantages that drainage is convenient, and therefore accumulated water in the filler after the open-air pit is filled is little.
本发明的露天坑充填方法,包括以下步骤:将充填管路伸入露天坑内;利用所述充填管路将充填料浆充填至所述露天坑内厚度小于第一预设值的充填层以便在所述充填层内形成充填体;在所述露天坑内从下至上依次充填并形成多个沿上下方向堆叠的所述充填体;其中,在形成每个所述充填体的过程中在每个所述充填层内形成集水坑,利 |
---|---|
Bibliography: | Application Number: CN202310645093 |