Reinforcing construction method for groove wall of underground diaphragm wall of subway station near lake complex geology

The invention provides a reinforcing construction method for a groove wall of an underground diaphragm wall of a lake-near complex geology subway station, and belongs to the technical field of underground foundation pit support structure construction of civil engineering. The lake-near complex geolo...

Full description

Saved in:
Bibliographic Details
Main Authors WU ZHENLI, YANG YONGYUE, LIU SHENGHUAN, CHEN QINGHUAI, YI LINGBING, LV ZHAOLONG, WANG YU, WANG YUANLIU, REN FANGYI, WU CHENGHAO
Format Patent
LanguageChinese
English
Published 04.08.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a reinforcing construction method for a groove wall of an underground diaphragm wall of a lake-near complex geology subway station, and belongs to the technical field of underground foundation pit support structure construction of civil engineering. The lake-near complex geological subway station underground diaphragm wall groove wall reinforcing construction method comprises the following steps that a construction pile position is marked according to a control point of jet grouting pile construction measured by a total station; a mortar discharging groove is dug according to the position of the pile position mark point, and a mortar mixing system is erected; the geological drilling rig is moved to the designated pile position mark point position, and drilling is conducted on the pile position mark point position; the jet grouting pile machine is moved to the corresponding hole-forming pile position, a drill bit is aligned with the center of the hole-forming pile position, and jet grout
Bibliography:Application Number: CN202310542791