Construction method of reserved hole in cast-in-place floor plate
The invention discloses a construction method of a reserved hole in a cast-in-place floor plate. The problems that a mold of an existing reserved hole cannot be repeatedly used, and the construction cost is high are solved. A stand column (1) is vertically arranged at the center of a reserved hole (...
Saved in:
Main Authors | , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
18.07.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a construction method of a reserved hole in a cast-in-place floor plate. The problems that a mold of an existing reserved hole cannot be repeatedly used, and the construction cost is high are solved. A stand column (1) is vertically arranged at the center of a reserved hole (22) in a floor plate pouring bottom formwork (23), a lower limiting pin hole (4) is formed in the lower portion of the stand column (1), the stand column above a cylindrical lower limiting step (2) is movably sleeved with a fourth lantern ring (11), the stand column above the fourth lantern ring (11) is movably sleeved with a lower compression spring (7), and the lower compression spring (7) is sleeved with a lower limiting pin hole (8). A third lantern ring (10) is movably sleeved on the upright post above the lower pressure spring; cantilever rods are radially arranged on the two lantern rings, lower arc-shaped vertical plates are hinged to the outer ends of the corresponding upper and lower cantilever rods, the |
---|---|
Bibliography: | Application Number: CN202310482110 |