Security risk active pre-control system construction method and security risk active pre-control system

The invention relates to a safety risk active pre-control system construction method and a safety risk active pre-control system. The safety risk active pre-control system construction method is used for performing safety risk active pre-control on a production process. The method comprises the foll...

Full description

Saved in:
Bibliographic Details
Main Authors ZHU JINGWEI, CHEN GUOXIANG, RUI WENJUN, YANG HONGWU, LIU JIANDONG, LIU TONGGAN, ZHOU YAMING, JIN CHEN, JIANG SHIKUAN
Format Patent
LanguageChinese
English
Published 14.07.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a safety risk active pre-control system construction method and a safety risk active pre-control system. The safety risk active pre-control system construction method is used for performing safety risk active pre-control on a production process. The method comprises the following steps: determining multiple types of intelligent technologies according to a management and control demand of a target production process; for each type of intelligent technology, according to an application mode and an application range of the intelligent technology in the target production process, determining modeling information of the intelligent technology in the target production process; performing application modeling according to the plurality of pieces of modeling information to obtain a plurality of application models; and obtaining basic information according to each application model, and importing the basic information into the application model to obtain the safety risk active pre-control syst
Bibliography:Application Number: CN202310173208