Optical fiber preform rod deposition workshop process test rod putting scheduling method and system
The invention discloses an optical fiber preform rod deposition workshop experiment rod putting scheduling method and system. The method comprises the following steps: (1) according to a current production plan and a putting plan of a process test rod, drawing an interference pattern H representing...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
02.06.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses an optical fiber preform rod deposition workshop experiment rod putting scheduling method and system. The method comprises the following steps: (1) according to a current production plan and a putting plan of a process test rod, drawing an interference pattern H representing the time when preform deposition equipment and preform sintering equipment need to wait for machines due to the fact that a preform deposition process and a preform sintering process need to be carried out in sequence; (2) by adopting heuristic learning, according to the interference graph obtained in the step (1), optimizing a production scheduling plan obtained by adding a putting plan of a process test bar into a current production plan by taking the sum of interference of the production scheduling plan as fitness and taking the minimum fitness as an optimization target; the interference sum of the production scheduling plan is the total number of the equipment pairs which interfere with each other in the produc |
---|---|
Bibliography: | Application Number: CN202310493704 |