Cascade hydropower station multi-dimensional safety intelligent management and control method
The invention provides a cascade hydropower station multi-dimensional safety intelligent management and control method. The management and control method comprises the following steps: collecting basic data of a target cascade hydropower station; an artificial intelligence model is adopted to extrac...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
16.05.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a cascade hydropower station multi-dimensional safety intelligent management and control method. The management and control method comprises the following steps: collecting basic data of a target cascade hydropower station; an artificial intelligence model is adopted to extract cascade hydropower station adaptability scheduling rules with administrator subjective decision-making preferences from historical operation scheduling data; determining an extreme risk source simulation target, a cascade hydropower station safety control target and a target control period; adopting a system dynamics method to construct a cascade hydropower station system dynamics model; determining a model variable function expression according to the main control equation of the model and the related data of the target cascade hydropower station; delimiting a multi-dimensional security constraint condition according to the security management and control target; and operating the cascade hydropower station syst |
---|---|
Bibliography: | Application Number: CN202310158607 |