Fabricated steel structure building construction method

The invention discloses an assembly type steel structure building construction method. Comprising the following steps that prefabricated parts are manufactured and coded respectively, an axis and a foundation elevation are determined, an amplification foot foundation is hoisted, a foundation support...

Full description

Saved in:
Bibliographic Details
Main Authors WANG JUN, DU GUOCHEN, ZHANG ZHAORUI, ZHANG ZHAOMIN, YANG HUA
Format Patent
LanguageChinese
English
Published 05.05.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses an assembly type steel structure building construction method. Comprising the following steps that prefabricated parts are manufactured and coded respectively, an axis and a foundation elevation are determined, an amplification foot foundation is hoisted, a foundation supporting beam or an outer wall below positive and negative zero is hoisted, a column-beam-wall integrated prefabricated part containing a structural column and a beam-wall integrated prefabricated part without the structural column are assembled in sequence, a floor slab is hoisted, and waterproof rubber strips are inlaid and filled. Provided is a sound-insulation rubber stick. According to the method, the prefabricated parts are coded and classified, the column-beam-wall integrated prefabricated parts containing the structural columns are firstly installed at intervals, and then the beam-wall integrated prefabricated parts without the structural columns are inserted, so that the field workload is greatly reduced, the c
Bibliography:Application Number: CN202310070715