Super-long working face double-measure roadway arrangement method under sequential mining condition

The invention discloses a super-long working face double-measure roadway arrangement method under the sequential mining condition. The super-long working face double-measure roadway arrangement method under the sequential mining condition comprises the following steps that a first gob-side roadway a...

Full description

Saved in:
Bibliographic Details
Main Authors LI YUNPENG, SU ZHENGUO, BI HUIJIE, WANG HONGWEI, LI SHAOGANG, MO YUNLONG, WANG JIANDA
Format Patent
LanguageChinese
English
Published 24.03.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a super-long working face double-measure roadway arrangement method under the sequential mining condition. The super-long working face double-measure roadway arrangement method under the sequential mining condition comprises the following steps that a first gob-side roadway and a first measure roadway are tunneled on a working face of a next section in the current stoping working face stoping process; a connection roadway is tunneled, wherein the connection roadway is tunneled from the first gob-side roadway to the first measure roadway; extending the connection roadway to a design position of a second measure roadway; tunneling the second measure roadway; finishing excavation of a second gob-side roadway after the current stoping working face finishes stoping and the gob stably sinks; and closing the connection roadway, the first measure roadway and the second measure roadway before the working face of the next section is stoped to the roadway intersection. The super-long working face
Bibliography:Application Number: CN202310057375