Closed-loop road network phase difference optimization method based on improved cut-off method

The invention discloses a closed-loop road network phase difference optimization method based on an improved cut-off method, and belongs to the technical field of traffic signal control. The method is characterized by comprising the following steps: S1, establishing a closed-loop road network connec...

Full description

Saved in:
Bibliographic Details
Main Authors YANG ZIYI, LIU BENXING, WANG XIAOQING, SUN FENG, LI DALONG, JIA MINGWU, ZHAO PENGSHENG, SHI ZHANHANG, JIAO FANGTONG, SONG ZIWEN, SHI ZHONGJI, SHI ZHENWEI
Format Patent
LanguageChinese
English
Published 10.03.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a closed-loop road network phase difference optimization method based on an improved cut-off method, and belongs to the technical field of traffic signal control. The method is characterized by comprising the following steps: S1, establishing a closed-loop road network connection priority level discrimination model based on fuzzy comprehensive evaluation, and determining a key intersection; s2, establishing a closed-loop road network phase difference optimization model based on an improved cut-off method; s3, determining a phase difference fine adjustment amount; and S4, obtaining a closed-loop road network phase difference control scheme. When the optimal phase difference of the intersection of the closed-loop road network is determined, firstly, on the basis of actual traffic parameters of the intersection and the closed-loop connecting line, the connecting line road grade, the green wave band width, the saturation degree and the traffic volume are selected as evaluation factors, and
Bibliography:Application Number: CN202211431269