System and method for automatic transfer switch load control

Systems and methods for managing loads on an electrical grid are provided. The load control system includes one or more energy sources connected to a common bus and a first device connected in series between the common bus and a first load. The first device may be an automatic transfer switch. A fir...

Full description

Saved in:
Bibliographic Details
Main Authors GILPIN JACOB R, NOVAK ANDREW
Format Patent
LanguageChinese
English
Published 30.12.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Systems and methods for managing loads on an electrical grid are provided. The load control system includes one or more energy sources connected to a common bus and a first device connected in series between the common bus and a first load. The first device may be an automatic transfer switch. A first device may include: switching hardware configured to connect and disconnect a first load from a common bus; and a load control circuit configured to disconnect the first load from the common bus after detecting the trigger event for a predetermined amount of time. The trigger event may include a frequency or voltage of electricity on the common bus falling below a threshold. 提供了用于管理电网上的负载的系统和方法。负载控制系统包括连接到公共总线的一个或更多个能量源和串联连接在公共总线和第一负载之间的第一设备。第一设备可以是自动转换开关。第一设备可以包括:开关硬件,该开关硬件被配置成将第一负载与公共总线连接和断开连接;以及负载控制电路,该负载控制电路被配置成在检测到触发事件持续预定时间量之后使第一负载与公共总线断开连接。触发事件可以包括公共总线上的电的频率或电压下降到低于阈值。
Bibliography:Application Number: CN202180032208