Rapid building device and building method for coke oven body building platform

The invention discloses a coke oven body masonry platform rapid erecting device and method. The coke oven body masonry platform rapid erecting device structurally comprises a plurality of erecting units. The plurality of building units are sequentially arranged between the two fireproof building wal...

Full description

Saved in:
Bibliographic Details
Main Authors YANG JIAHUA, WU CHUNQIAO, ZHOU MIN
Format Patent
LanguageChinese
English
Published 23.12.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a coke oven body masonry platform rapid erecting device and method. The coke oven body masonry platform rapid erecting device structurally comprises a plurality of erecting units. The plurality of building units are sequentially arranged between the two fireproof building walls; the multiple erecting units are connected through the first connecting plates. Each erecting unit can do vertical reciprocating motion in the height direction of the refractory building wall, and each erecting unit comprises a vertical lifting assembly; the vertical lifting assembly is composed of four cylindrical steel sleeves, the upper portion of each steel sleeve is provided with an anti-disengagement protection ring, the lower portion of each steel sleeve is provided with a limiting ring to prevent the vertical lifting assembly from disengagement during lifting, and the top platform is fixedly connected with the vertical lifting assembly through bolts to form an erecting unit. And one erecting unit and the
Bibliography:Application Number: CN202211187600