Roadbed widening construction method for existing buried pipeline

The invention relates to the technical field of road widening, and particularly discloses a roadbed widening construction method for an existing buried pipeline, which comprises the following steps: S1, removing the edge of an old roadbed, namely removing cracks of the old roadbed, drainage side dit...

Full description

Saved in:
Bibliographic Details
Main Authors MA CHANGZHENG, CHAO GUOXIN, SHI HUIMING, LI FEI, SHI FUMING, CHEN TIANYU, LIU BOHAN, MENG JIE, LI HEPING, XU MAOWEI
Format Patent
LanguageChinese
English
Published 23.12.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to the technical field of road widening, and particularly discloses a roadbed widening construction method for an existing buried pipeline, which comprises the following steps: S1, removing the edge of an old roadbed, namely removing cracks of the old roadbed, drainage side ditches on the edge of the old roadbed and a broken falling platform mechanically or manually; s2, pipeline excavation is conducted, specifically, a part of a pipeline is excavated, and a part of the pipeline is exposed outside; s3, pipeline protection is conducted, specifically, a protection device used for improving the settlement resistance of the pipeline is transported to the position near the pipeline, and then the protection device is installed on the pipeline through an installation device; s4, a new roadbed is tamped, filling materials such as soil and stones are poured at the position of the new roadbed, and then the new roadbed is compacted through a road pressing device; and S5, the pavement is poured, and