Optimization method for simulating tunnel excavation
The invention provides an optimization method for simulating tunnel excavation. The method comprises the steps that a rock-soil body component and a lining component are built in sequence, and the lining component is integrally assembled to the corresponding position of the rock-soil body component;...
Saved in:
Main Authors | , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
16.12.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides an optimization method for simulating tunnel excavation. The method comprises the steps that a rock-soil body component and a lining component are built in sequence, and the lining component is integrally assembled to the corresponding position of the rock-soil body component; according to a preset partial excavation construction method, the rock-soil body component is divided into a plurality of parts of rock-soil bodies; determining the execution sequence of the ground stress analysis step, the support analysis step, the softening analysis step and the removal analysis step; a ground stress analysis step is executed, and ground stress balance is implemented when the whole lining part is invalid; a supporting analysis step is executed, specifically, the lining component is activated as a whole, and lining supporting is implemented; and sequentially executing a softening analysis step and a removal analysis step on each part of the segmented rock-soil body to obtain the tunnel. Repeated |
---|---|
Bibliography: | Application Number: CN202211214684 |