Spent fuel transportation plant layout structure and hoisting method of spent fuel transportation container

The invention discloses a spent fuel transportation plant layout structure and a spent fuel transportation container hoisting method, the spent fuel transportation plant layout structure comprises a loading well, a preparation well and a hoisting hole which are arranged in a line, and buffer layers...

Full description

Saved in:
Bibliographic Details
Main Authors HE WEITING, LIU CHANGYONG, PAN KEJUN, YE ZIQING
Format Patent
LanguageChinese
English
Published 02.12.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a spent fuel transportation plant layout structure and a spent fuel transportation container hoisting method, the spent fuel transportation plant layout structure comprises a loading well, a preparation well and a hoisting hole which are arranged in a line, and buffer layers are respectively arranged below the loading well, the preparation well and the hoisting hole; a transfer platform higher than the bearing bottom surface of the loading well is arranged in the loading well, so that a spent fuel transportation container is hoisted into the preparation well from the transfer platform; and the preparation well and the hoisting hole are adjacently connected and are communicated or separated through a gate. Through the arrangement of the transfer platform in the loading well and the arrangement of the gate between the preparation well and the transfer well, it is guaranteed that the hoisting height of the spent fuel transportation container in each step of hoisting and transferring does
Bibliography:Application Number: CN202211135813