Construction method for quickly installing mine shaft pipeline
The invention provides a construction method for quickly installing a mine shaft pipeline, and relates to the technical field of mine pipeline installation. The construction method for rapid installation of the mine vertical shaft pipeline comprises the following construction steps that S1, system a...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
11.11.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a construction method for quickly installing a mine shaft pipeline, and relates to the technical field of mine pipeline installation. The construction method for rapid installation of the mine vertical shaft pipeline comprises the following construction steps that S1, system accounting and model selection are carried out, the accumulated total weight of lifted pipes and accessories is estimated according to the work amount of the vertical shaft pipeline, and then lifting equipment matched with the accumulated total weight of the pipes and the accessories is selected according to the safety coefficient; s2, a bottom operation room is built, a protection top with a protection function is built at the bottom of the vertical shaft, and the bottom operation room is formed; s3, a lifting system is installed, and anchor rods are drilled in the top of the vertical shaft. By adopting the combination of the two sets of hand-drive hoists at the top, the anti-swing rope in the middle and the operat |
---|---|
Bibliography: | Application Number: CN202211073052 |