Method for recovering isolation pillar without reserved top protection layer under loose tailing filling body

The invention discloses a method for recovering an isolation ore pillar without a reserved top protecting layer under a loose tailing filling body, and relates to the technical field of mining methods. The method comprises the steps that a grouting anchor cable is arranged in a tailing filling body...

Full description

Saved in:
Bibliographic Details
Main Authors CHEN SHAOJIE, GAO SHIXIAN, FENG FAN, YAN ZHIKAI, FU LIJIE, LI JIAQI, JIANG NING, XIE ZHIWEI, LI MINGKUN, YOON DAE-WI
Format Patent
LanguageChinese
English
Published 08.11.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a method for recovering an isolation ore pillar without a reserved top protecting layer under a loose tailing filling body, and relates to the technical field of mining methods. The method comprises the steps that a grouting anchor cable is arranged in a tailing filling body in a stage haulage roadway; drilling a hole in the filling body, installing a hole drilling peeping instrument, and determining the diffusion degree and range of the slurry; horizontal anchor rods are arranged on the filling bodies in the haulage roadway to form artificial roofs; the horizontal isolation jambs are recycled through an upward horizontal layered drift type filling mining method, a stope is divided into a plurality of layers for stoping in the vertical direction, and each layer is provided with a plurality of drifts; the top plate of the access road is supported by adopting an anchor rod support before stoping to the uppermost layer, and filling is performed after stoping; supporting the overlying arti
Bibliography:Application Number: CN202210795937