Method for recovering isolation pillar without reserved top protection layer under loose tailing filling body
The invention discloses a method for recovering an isolation ore pillar without a reserved top protecting layer under a loose tailing filling body, and relates to the technical field of mining methods. The method comprises the steps that a grouting anchor cable is arranged in a tailing filling body...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
08.11.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a method for recovering an isolation ore pillar without a reserved top protecting layer under a loose tailing filling body, and relates to the technical field of mining methods. The method comprises the steps that a grouting anchor cable is arranged in a tailing filling body in a stage haulage roadway; drilling a hole in the filling body, installing a hole drilling peeping instrument, and determining the diffusion degree and range of the slurry; horizontal anchor rods are arranged on the filling bodies in the haulage roadway to form artificial roofs; the horizontal isolation jambs are recycled through an upward horizontal layered drift type filling mining method, a stope is divided into a plurality of layers for stoping in the vertical direction, and each layer is provided with a plurality of drifts; the top plate of the access road is supported by adopting an anchor rod support before stoping to the uppermost layer, and filling is performed after stoping; supporting the overlying arti |
---|---|
Bibliography: | Application Number: CN202210795937 |