Grid system suitable for rural overhead power distribution network and grid construction method
The invention discloses a net rack system suitable for a rural overhead power distribution network and a net rack construction method, and the net rack system suitable for the rural overhead power distribution network comprises two transformer substations, a plurality of target ring network points a...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
18.10.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a net rack system suitable for a rural overhead power distribution network and a net rack construction method, and the net rack system suitable for the rural overhead power distribution network comprises two transformer substations, a plurality of target ring network points and an overhead line. The two transformer substations are configured to determine transmission currents respectively and transmit the transmission currents to matched target ring network points through two corresponding overhead lines respectively; the plurality of target looped network points are configured to connect the two overhead lines of each transformer substation, connect the two transformer substations to obtain a target looped network frame, and transmit the obtained transmission current to a first load object of a power supply area according to a first current type; wherein the first current type is the type of current used by the first load object; and the overhead line is configured to contact the plur |
---|---|
Bibliography: | Application Number: CN202211093091 |