Cascade reservoir day-ahead scheduling period end reservoir water level control method considering water abandoning risk

The invention discloses a cascade reservoir day-ahead scheduling period end reservoir water level control method considering a water abandoning risk, and the method comprises the steps: obtaining an error distribution rule of runoff prediction and load prediction according to historical prediction/p...

Full description

Saved in:
Bibliographic Details
Main Authors YANG CHENGSHENG, ZHU ZHONGJIA, KAI LE, MIAO QIUXUN, ZHANG LEI, WU CHENGJUN, SHEN YI, WANG MAN, WANG ZHAOYANG, ZHONG XIAOJIAO
Format Patent
LanguageChinese
English
Published 14.10.2022
Subjects
Online AccessGet full text

Cover

Loading…