Cascade reservoir day-ahead scheduling period end reservoir water level control method considering water abandoning risk

The invention discloses a cascade reservoir day-ahead scheduling period end reservoir water level control method considering a water abandoning risk, and the method comprises the steps: obtaining an error distribution rule of runoff prediction and load prediction according to historical prediction/p...

Full description

Saved in:
Bibliographic Details
Main Authors YANG CHENGSHENG, ZHU ZHONGJIA, KAI LE, MIAO QIUXUN, ZHANG LEI, WU CHENGJUN, SHEN YI, WANG MAN, WANG ZHAOYANG, ZHONG XIAOJIAO
Format Patent
LanguageChinese
English
Published 14.10.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a cascade reservoir day-ahead scheduling period end reservoir water level control method considering a water abandoning risk, and the method comprises the steps: obtaining an error distribution rule of runoff prediction and load prediction according to historical prediction/prediction data and actual data; according to an error distribution rule of runoff forecasting and load forecasting, calculating a time-period water abandoning risk of cascade reservoir hydropower station dispatching; according to a water abandoning risk calculation method, carrying out water abandoning early warning simulation on the historical scheduling process of the cascade reservoir hydropower station to obtain a water abandoning early warning empty report rate and a missing report rate of the cascade reservoir hydropower station; obtaining a critical abandoned water early warning value of each cascade reservoir hydropower station by taking the combined minimization of the abandoned water early warning empty r
Bibliography:Application Number: CN202211098866