Pipeline supporting construction method in pump room

According to the method for supporting the pipeline in the pump room, the pipeline can be installed through the temporary steel supports, the temporary steel supports and the steel bars form a concrete buttress steel framework, material waste is avoided, and engineering implementation safety is impr...

Full description

Saved in:
Bibliographic Details
Main Authors RAO TING, HU ZHIQIANG, HE BIJUAN, JI JUAN, XIA JIAHUA
Format Patent
LanguageChinese
English
Published 20.09.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:According to the method for supporting the pipeline in the pump room, the pipeline can be installed through the temporary steel supports, the temporary steel supports and the steel bars form a concrete buttress steel framework, material waste is avoided, and engineering implementation safety is improved. Anchor bolts are arranged on a bottom plate of the pump room at the pre-installation position of the pipeline, and the double-end-plate vertical profile steel support is fixed; horizontal section steel supports are welded to the positions, at the preset installation height, of the pipeline and welded to the fixed double-end-plate vertical section steel supports to form pipeline temporary steel supports; when the pipeline is installed, the height of the pipeline can be adjusted through the cushion blocks, the rubber pads are attached to the periphery of the pipeline, the strap tightly holds the rubber pads, and the pipeline is fixed to the temporary steel support through the bolts. Concrete buttress vertical r
Bibliography:Application Number: CN202210697411