Steel beam and concrete filled steel tube bundle combined structure
The invention relates to the technical field of engineering, in particular to a steel beam and concrete filled steel tube bundle combined structure which comprises a first mounting mechanism mounted with the concrete filled steel tube bundle combined structure, and a limiting mechanism capable of ad...
Saved in:
Main Authors | , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
20.09.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to the technical field of engineering, in particular to a steel beam and concrete filled steel tube bundle combined structure which comprises a first mounting mechanism mounted with the concrete filled steel tube bundle combined structure, and a limiting mechanism capable of adjusting the position of the first mounting mechanism and being fixed is arranged on the first mounting mechanism. A second mounting mechanism for mounting the steel beam is arranged on one side of the first mounting mechanism, and a rotating mechanism which is matched with the limiting mechanism and assists the second mounting mechanism to be aligned with the first mounting mechanism in connecting position is arranged on one side of the first mounting mechanism. The steel beam and the steel pipe concrete bundle combined structure are connected in an aligned mode, the situation that the steel pipe bundle combined structure and the steel beam are aligned only through observation of workers and temporary adjustment is |
---|---|
Bibliography: | Application Number: CN202210891347 |