Method for interruptible load to participate in clearing of electric energy and standby power combination and related device
The invention belongs to the field of electric power automation, and discloses an interruptible load participated electric energy and standby united clearing method and a related device. Comprising the following steps: acquiring a thermal power generating unit power generation cost quotation, a ther...
Saved in:
Main Authors | , , , , , , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
30.08.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention belongs to the field of electric power automation, and discloses an interruptible load participated electric energy and standby united clearing method and a related device. Comprising the following steps: acquiring a thermal power generating unit power generation cost quotation, a thermal power generating unit standby scheduling cost quotation, a thermal power generating unit starting cost, an interruptible load power utilization cost quotation, an interruptible load standby scheduling cost quotation, a new energy unit power generation predicted quantity and a load predicted quantity of a power system; calling a preset power system joint clearing model to obtain a power system clearing result; and controlling the power system to operate according to the clearing result of the power system. Risk loss caused by insufficient reserve on the power system is introduced to analyze the influence of the insufficient reserve on the reliability of the system, and the risk loss is combined with electric ene |
---|---|
Bibliography: | Application Number: CN202210480844 |