Construction method and device of day-ahead optimization scheduling strategy and electronic equipment
A construction method of a day-ahead optimization scheduling strategy is applied to electronic equipment and used for constructing the day-ahead optimization scheduling strategy of an electric heating gas comprehensive energy system, and specifically comprises the steps that an electric power flow m...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
30.08.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A construction method of a day-ahead optimization scheduling strategy is applied to electronic equipment and used for constructing the day-ahead optimization scheduling strategy of an electric heating gas comprehensive energy system, and specifically comprises the steps that an electric power flow model, a thermal power network model and a natural gas transmission network model of the electric heating gas comprehensive energy system are established; and based on the obtained models, carrying out strategy construction by taking economical efficiency as a target to obtain the day-ahead optimization scheduling strategy. Compared with the traditional scheme, the technical scheme provided by the invention well considers the coupling characteristic between energy sources, so that the obtained day-ahead optimization scheduling strategy is more flexible and more economical, and the scheduling cost is reduced.
一种日前优化调度策略的构建方法,该方法应用于电子设备,用于构建电热气综合能源系统的日前优化调度策略,具体为建立电热气综合能源系统的电力潮流模型、热力网络模型和天然气传输网络模型;基于得到的这些模型,以经济性为目标进行策 |
---|---|
Bibliography: | Application Number: CN202210606494 |