Construction method and device of day-ahead optimization scheduling strategy and electronic equipment

A construction method of a day-ahead optimization scheduling strategy is applied to electronic equipment and used for constructing the day-ahead optimization scheduling strategy of an electric heating gas comprehensive energy system, and specifically comprises the steps that an electric power flow m...

Full description

Saved in:
Bibliographic Details
Main Authors DAI PAN, WANG LEI, HU ZHESHENG, YANG LI, HUANG JINGJING, ZHU CHAO, ZHANG MANYING, LIN LING, LIU ZHAOYU, ZOU BO
Format Patent
LanguageChinese
English
Published 30.08.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A construction method of a day-ahead optimization scheduling strategy is applied to electronic equipment and used for constructing the day-ahead optimization scheduling strategy of an electric heating gas comprehensive energy system, and specifically comprises the steps that an electric power flow model, a thermal power network model and a natural gas transmission network model of the electric heating gas comprehensive energy system are established; and based on the obtained models, carrying out strategy construction by taking economical efficiency as a target to obtain the day-ahead optimization scheduling strategy. Compared with the traditional scheme, the technical scheme provided by the invention well considers the coupling characteristic between energy sources, so that the obtained day-ahead optimization scheduling strategy is more flexible and more economical, and the scheduling cost is reduced. 一种日前优化调度策略的构建方法,该方法应用于电子设备,用于构建电热气综合能源系统的日前优化调度策略,具体为建立电热气综合能源系统的电力潮流模型、热力网络模型和天然气传输网络模型;基于得到的这些模型,以经济性为目标进行策
Bibliography:Application Number: CN202210606494