Protective dismantling construction method for basement pile foundation adjacent to existing subway line
The invention provides a protective dismantling construction method for a pile foundation of a basement adjacent to an existing subway line. The protective dismantling construction method comprises the following steps that the surface of the basement is cleaned, and a construction hoisting hole is f...
Saved in:
Main Authors | , , , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
30.08.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a protective dismantling construction method for a pile foundation of a basement adjacent to an existing subway line. The protective dismantling construction method comprises the following steps that the surface of the basement is cleaned, and a construction hoisting hole is formed; constructing a retaining wall at the junction position of the underground structure to be dismantled and the non-dismantling side, and meanwhile, constructing a buttress wall on the side wall of the basement to be dismantled; filling an underground structure cavity with backfill soil, and refilling water to ensure balance of underground water levels inside and outside the basement; the basement top plate is dismantled through wire saw cutting; hardening the area above the basement; a bottom plate and a bearing platform of the basement are broken and removed through a full-rotation full-casing drilling machine; the pile foundation is pulled out; and plain concrete backfilling is carried out. The method is use |
---|---|
Bibliography: | Application Number: CN202210796491 |