Reservoir end-of-flood impounding flood control and benefit-making scheduling cooperation domain measurement method
The invention discloses a reservoir end-of-flood storage flood control and profit-making scheduling cooperation domain measurement method, which comprises the following steps of: respectively simulating and calculating two situations of complete cooperation and complete non-cooperation of a profit-m...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
12.08.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a reservoir end-of-flood storage flood control and profit-making scheduling cooperation domain measurement method, which comprises the following steps of: respectively simulating and calculating two situations of complete cooperation and complete non-cooperation of a profit-making department to a flood control department by solving a reservoir end-of-flood storage scheduling uncertain two-layer planning optimistic model and a pessimistic model representing different cooperation situations; therefore, the upper and lower bounds of the flood control and benefit-making cooperation domain under uncertain conditions are respectively determined, and the cooperation domain between flood control and benefit-making is quantitatively measured according to the comparison of scheduling benefits. The invention provides a new analysis tool for revealing and demonstrating the cooperation possibility and the cooperation space between the flood prevention department and the benefit-making department of |
---|---|
Bibliography: | Application Number: CN202210394270 |