Reservoir end-of-flood impounding flood control and benefit-making scheduling cooperation domain measurement method

The invention discloses a reservoir end-of-flood storage flood control and profit-making scheduling cooperation domain measurement method, which comprises the following steps of: respectively simulating and calculating two situations of complete cooperation and complete non-cooperation of a profit-m...

Full description

Saved in:
Bibliographic Details
Main Authors WU FENGYAN, WANG XIN, ZHOU NIANLAI, HU TIESONG
Format Patent
LanguageChinese
English
Published 12.08.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a reservoir end-of-flood storage flood control and profit-making scheduling cooperation domain measurement method, which comprises the following steps of: respectively simulating and calculating two situations of complete cooperation and complete non-cooperation of a profit-making department to a flood control department by solving a reservoir end-of-flood storage scheduling uncertain two-layer planning optimistic model and a pessimistic model representing different cooperation situations; therefore, the upper and lower bounds of the flood control and benefit-making cooperation domain under uncertain conditions are respectively determined, and the cooperation domain between flood control and benefit-making is quantitatively measured according to the comparison of scheduling benefits. The invention provides a new analysis tool for revealing and demonstrating the cooperation possibility and the cooperation space between the flood prevention department and the benefit-making department of
Bibliography:Application Number: CN202210394270