TBM tunnel pre-stressed anchor rod and U-shaped steel active supporting system and construction method

The invention discloses a TBM tunnel local broken surrounding rock pre-stressed anchor rod and U-shaped steel combined initial active supporting system which comprises a plurality of U-shaped steel arches used for being attached to the inner side wall of a surrounding rock local broken area and arra...

Full description

Saved in:
Bibliographic Details
Main Authors LI ZHIJUN, HONG KAIRONG, LIU YONGSHENG, YIN LONG, CHEN QIAO, YOU JINHU, PAN YUE, XIE TAO, ZHANG JICHAO
Format Patent
LanguageChinese
English
Published 03.06.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a TBM tunnel local broken surrounding rock pre-stressed anchor rod and U-shaped steel combined initial active supporting system which comprises a plurality of U-shaped steel arches used for being attached to the inner side wall of a surrounding rock local broken area and arranged at intervals in the trend of a tunnel till crossing the whole surrounding rock local broken area. A plurality of U-shaped holes are formed in each U-shaped steel bottom plate at intervals in the length direction of the U-shaped steel bottom plate, and each U-shaped hole is in a long strip shape. Each U-shaped steel arch frame annularly and upwards spans a broken area and is used for supporting local broken surrounding rock and bearing loose pressure of the surrounding rock; the U-shaped steel arch frame is used for being matched with the pre-stressed anchor rods, and the tail ends of the pre-stressed anchor rods are driven into the tunnel from the outer side of the tunnel, penetrate through a surrounding rock
Bibliography:Application Number: CN202210279469