Construction process for constructing high-filling highway embankment by red-layer mudstone

The invention relates to a construction process for constructing a high-filling highway embankment by red-layer mudstone. The construction process comprises the following steps: S1, cleaning a cleaning a constructed pavement; s2, pretreatment: spraying water to the red-layer mudstone, wherein the re...

Full description

Saved in:
Bibliographic Details
Main Authors ZHANG TAO, WANG XIAOWEI, LIU FEI, ZHOU WENQIANG, XU CHAO, ZONG XUXU, WANG PEIGUANG, LI YUANYUAN, ZHANG XINGANG
Format Patent
LanguageChinese
English
Published 12.04.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a construction process for constructing a high-filling highway embankment by red-layer mudstone. The construction process comprises the following steps: S1, cleaning a cleaning a constructed pavement; s2, pretreatment: spraying water to the red-layer mudstone, wherein the red-layer mudstone absorbs water, expands and disintegrates; s3, layered filling: carrying out layered filling on the construction area embankment; s4, uniform loose laying is conducted, specifically, each layer of red layer mudstone is subjected to uniform loose laying; s5, impact type rolling is conducted, specifically, each layer of red layer mudstone is subjected to impact compaction through an impact rolling wheel; s6, compaction is conducted, specifically, the red-layer mudstone is compacted in a common compaction mode and a dynamic compaction mode; and S7, quality detection is conducted, specifically, tracking detection is conducted on each layer of red-layer mudstone, then reinspection is conducted, sampling
Bibliography:Application Number: CN202111427943