Shield construction method for small-clear-distance tunnel
The invention discloses a shield construction method for a small-clear-distance tunnel. The shield construction method comprises the steps that firstly, a preceding tunnel and a following tunnel are determined; step 2, reinforcing the soil body of the preceding tunnel in a small clear distance range...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
05.04.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a shield construction method for a small-clear-distance tunnel. The shield construction method comprises the steps that firstly, a preceding tunnel and a following tunnel are determined; step 2, reinforcing the soil body of the preceding tunnel in a small clear distance range, wherein the reinforcing comprises ground soil body reinforcing and in-tunnel grouting reinforcing; when the ground soil body is reinforced, for the tunnels with the vertical spatial positions, the soil body between the preceding tunnel and the following tunnel is reinforced through stirring piles or jet grouting piles or grouting; for the tunnels of which the spatial positions are parallel, reinforcing a soil body between the preceding tunnel and the following tunnel by adopting isolation piles; thirdly, after shield tunneling of the preceding tunnel is completed, a walking type hydraulic supporting trolley is installed in the preceding tunnel; and 4, when the following tunnel shield is tunneled to the small clea |
---|---|
Bibliography: | Application Number: CN202111617034 |