Soft foundation treatment process for low filling road section pipe pile composite foundation

The invention discloses a soft foundation treatment process for a low filling road section pipe pile composite foundation. The soft foundation treatment process comprises the following steps that a positioning ring is pressed into the foundation; the pipe pile is correspondingly pressed into the pos...

Full description

Saved in:
Bibliographic Details
Main Authors YANG HONGZHU, HE CHANGMING, QIAN CHAOQING, PENG GONGXUN, XIAO LITUO, XIONG YONG, MA LIZHU
Format Patent
LanguageChinese
English
Published 08.02.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a soft foundation treatment process for a low filling road section pipe pile composite foundation. The soft foundation treatment process comprises the following steps that a positioning ring is pressed into the foundation; the pipe pile is correspondingly pressed into the positioning ring and penetrates into the bearing stratum of the foundation, and a cavity is formed above the pipe pile; soil in the annular cavity is cleaned into an inner cavity of the pipe pile, and the annular cavity communicates with the cavity to form a cylindrical cavity; a limiting stopper is installed on the top of the pipe pile, and the limiting stopper is connected with or abuts against the pipe pile and the positioning ring; the cylindrical cavity is filled with a light flexible filler and a discrete filler in sequence; and a geocell layer is arranged on the original ground. The cylindrical cavity can be formed by pressing the positioning ring and the pipe pile in sequence, the filling assembly can be place
Bibliography:Application Number: CN202111185088