Top-down construction method for flood control and drainage riverway slope protection and ecological clamping body
The invention discloses a top-down construction method for a flood control and drainage riverway slope protection and an ecological clamping body. The construction method comprises the steps of designing before construction; firstly, excavating from the position of the highest point of the riverway...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | Chinese English |
Published |
18.01.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a top-down construction method for a flood control and drainage riverway slope protection and an ecological clamping body. The construction method comprises the steps of designing before construction; firstly, excavating from the position of the highest point of the riverway slope protection, arranging a first-stage slope surface and a stepped horizontal operation road, and splicing the ecological clamping body to the top of the slope surface to form a first-stage slope protection surface; continuously constructing to form a second-stage slope protection surface and a second-stage stepped horizontal operation road, pouring the first-stage stepped horizontal operation road, closing the bottom of the first-stage slope protection surface and the top of the second-stage slope protection surface to form a closed hardened road surface till the Nth time, and forming a multi-stage slope protection surface and a multi-stage stepped horizontal operation road till the bottom depth of a riverbed r |
---|---|
Bibliography: | Application Number: CN202111439471 |