Rail transit construction scheduling management system and method based on drawing board analysis and medium
The invention provides a rail transit construction scheduling management system and method based on drawing board analysis and a medium, and the method comprises the steps: defining a global variable of a drawing board in parameter configuration as a drawing board parameter, and assigning a value to...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
14.01.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a rail transit construction scheduling management system and method based on drawing board analysis and a medium, and the method comprises the steps: defining a global variable of a drawing board in parameter configuration as a drawing board parameter, and assigning a value to the global variable; in drawing board analysis, according to service attribute data and the drawing board parameter, enabling a rail-mounted area and a power supply area to form a rectangular box, separately analyzing the line area data of the rail-mounted area and the power supply area, generating SVG graphs connected end to end, and displaying the SVG graphs on the drawing board; configuring the state attribute data of the rail-mounted area and the power supply area in attribute configuration; drawing construction plans in the drawing board, selecting a construction area and the power supply area according to the construction plans, generating area description according to a semantic analysis rule, displaying a |
---|---|
Bibliography: | Application Number: CN202010603779 |