Urban village distribution transformer short-term power load prediction method and system

The invention discloses an urban village distribution transformer short-term power load prediction method and system, and the method comprises the steps: forming a Prophet-LSTM combined short-term power load prediction model through an LSTM model and a Prophet model, inputting the obtained temperatu...

Full description

Saved in:
Bibliographic Details
Main Authors YUE SHOUZHI, XIANG LI, HONG HAISHENG, LIU ZHE, XIONG JUN, WANG WEICHAO, LIU QI, DUAN LIAN, CHEN JING
Format Patent
LanguageChinese
English
Published 14.01.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses an urban village distribution transformer short-term power load prediction method and system, and the method comprises the steps: forming a Prophet-LSTM combined short-term power load prediction model through an LSTM model and a Prophet model, inputting the obtained temperature data, load data and corresponding holiday and festival data of a target urban village distribution transformer area into the short-term power load prediction model, multiplying a predicted load value output by the LSTM model by a first weight, multiplying a predicted load value output by the Prophet model by a second weight, and then superposing the two to obtain a final predicted load value as output of the short-term power load prediction model. According to the load prediction method provided by the invention, the accuracy of load prediction is more than 70% and can reach 92.86% at most, and the accuracy and the reliability of power load prediction of the urban village transformer area are improved. 本发明公开了一种城
Bibliography:Application Number: CN202111236075