Urban village distribution transformer short-term power load prediction method and system
The invention discloses an urban village distribution transformer short-term power load prediction method and system, and the method comprises the steps: forming a Prophet-LSTM combined short-term power load prediction model through an LSTM model and a Prophet model, inputting the obtained temperatu...
Saved in:
Main Authors | , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
14.01.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses an urban village distribution transformer short-term power load prediction method and system, and the method comprises the steps: forming a Prophet-LSTM combined short-term power load prediction model through an LSTM model and a Prophet model, inputting the obtained temperature data, load data and corresponding holiday and festival data of a target urban village distribution transformer area into the short-term power load prediction model, multiplying a predicted load value output by the LSTM model by a first weight, multiplying a predicted load value output by the Prophet model by a second weight, and then superposing the two to obtain a final predicted load value as output of the short-term power load prediction model. According to the load prediction method provided by the invention, the accuracy of load prediction is more than 70% and can reach 92.86% at most, and the accuracy and the reliability of power load prediction of the urban village transformer area are improved.
本发明公开了一种城 |
---|---|
Bibliography: | Application Number: CN202111236075 |