Construction process for pouring large-size reinforced concrete beam at a time
The invention discloses a construction process for pouring a large-size reinforced concrete beam at a time. The construction process comprises a prefabricated beam body formwork and a sliding rail; the beam body formwork comprises a plurality of beam bottom formworks, a plurality of end formworks, a...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
11.01.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a construction process for pouring a large-size reinforced concrete beam at a time. The construction process comprises a prefabricated beam body formwork and a sliding rail; the beam body formwork comprises a plurality of beam bottom formworks, a plurality of end formworks, a plurality of standard side formworks and a plurality of corner connecting pieces; a T-shaped sliding groove with the wide interior and the narrow exterior is formed in the length direction of the sliding rail; the two ends of the sliding rail are each provided with a positioning sliding block; the front face and the back face of each standard side formwork are provided with a sliding block and a bottom formwork bracket respectively; each corner connecting piece comprises a corner formwork which is vertically arranged and has an L-shaped cross section. The thickness of the side end of each corner formwork is consistent with that of the corresponding standard side formwork; a connecting stand column is fixed to the |
---|---|
Bibliography: | Application Number: CN202111275266 |