Power grid real-time scheduling method based on time sequence
The invention discloses a power grid real-time scheduling method based on a time sequence, and the method comprises the steps: capturing resource data in a power grid system through a web crawler tool, and carrying out the preprocessing of the resource data; inputting the preprocessed resource data...
Saved in:
Main Authors | , , , , , , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
07.01.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a power grid real-time scheduling method based on a time sequence, and the method comprises the steps: capturing resource data in a power grid system through a web crawler tool, and carrying out the preprocessing of the resource data; inputting the preprocessed resource data into a scheduling plan architecture to form a resource scheduling standard database based on the scheduling plan architecture; constructing a real-time scheduling model based on a time sequence, performing strategy matching training with the standard database information, and determining an available resource scheduling strategy; and feeding back the available resource scheduling strategy to a platform control center for resource rationalization scheduling. The power grid resources are reasonably scheduled in real time through the time sequence, the information is synchronized, the problem that delay influences the accuracy of a scheduling plan is solved, and the available resources of the power grid are reasonably |
---|---|
Bibliography: | Application Number: CN202111003901 |