METHOD FOR CONSTRUCTING ELEVATOR AND ELEVATOR
The invention relates to a method for constructing an elevator (E;E'), comprising providing an elevator car (1); providing a plurality of prefabricated hoistway modules (A,B,C; A',B',C') to be piled on top of each other, each hoistway module (A,B,C; A',B',C') borde...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
04.01.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to a method for constructing an elevator (E;E'), comprising providing an elevator car (1); providing a plurality of prefabricated hoistway modules (A,B,C; A',B',C') to be piled on top of each other, each hoistway module (A,B,C; A',B',C') bordering a hoistway space (S) into which the whole elevator car (1) or at least an upper or lower end thereof can be fitted to move; and piling said plurality of prefabricated modules (A,B,C; A',B',C') on top of each other, such that the hoistway spaces (S) of the prefabricated modules (A,B,C; A',B',C') are vertically aligned forming a continuous vertically elongated hoistway (H) where the elevator car (1) can be fitted to move; and arranging the elevator car (1) to be vertically movable in the hoistway (H). The invention also relates to an elevator obtained with the method.
本发明涉及一种用于建造电梯(E;E')的方法,包括:提供电梯轿厢(1);提供多个预制井道模块(A、B、C;A'、B'、C'),该预制井道模块将被堆叠在彼此顶部,每个井道模块(A、B、C;A'、B'、C')界定井道空间(S),整个电梯轿厢(1)或至少其上端或下端可装配移动到井道空间(S)中以移动;以及将所述多个预制模块(A、B、C;A'、B'、C')堆叠在彼此的 |
---|---|
Bibliography: | Application Number: CN202080039381 |