Up-down separate excavation type construction method for underground channel transversely penetrating through lower part of upper building pile foundation

The invention discloses an up-down separate excavation type construction method for an underground channel transversely penetrating through the lower part of an upper building pile foundation. The up-down separate excavation type construction method comprises the steps that a working well is built;...

Full description

Saved in:
Bibliographic Details
Main Authors WANG SHUWEN, LIU NIANWU, HUANG XU, HU WEI, NA MINGWANG, PAN PENGFEI, NI ZHIPENG, WANG JUNQI, LIN QIANG
Format Patent
LanguageChinese
English
Published 28.12.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses an up-down separate excavation type construction method for an underground channel transversely penetrating through the lower part of an upper building pile foundation. The up-down separate excavation type construction method comprises the steps that a working well is built; the whole section is dug to the position with the distance D away from a first row of pile foundations of an upper building to form a first-section blank channel, and a first-section blank channel part channel protection wall frame is poured in the first-section blank channel; on the premise that a soil body on the lower part of the first row of pile foundations is reserved, excavation continues to be carried out to the position with the distance D from a second row of pile foundations of the upper building, so that a second-section blank channel and the upper half part of the first row of pile foundation blank channel are formed; and the upper half part of a pouring pile foundation underpinning structure and a sec