engineering construction method and equipment

The invention relates to an engineering construction method and equipment. The engineering construction method comprises the following steps: step S1, setting a coordinate point and a distance value between the coordinate point and a base surface of a road to be constructed, detecting an actual dist...

Full description

Saved in:
Bibliographic Details
Main Author CHU TIANYUN
Format Patent
LanguageChinese
English
Published 10.12.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to an engineering construction method and equipment. The engineering construction method comprises the following steps: step S1, setting a coordinate point and a distance value between the coordinate point and a base surface of a road to be constructed, detecting an actual distance between the coordinate point and the base surface of the road to be constructed by adopting a range finder, and controlling the range finder to advance on the base surface of the road to be constructed at a set constant speed value; the engineering construction method and equipment are suitable for primary leveling of an uneven road, the equipment detects the actual flatness of the road surface when moving on the road, the convex positions are milled, base materials generated by milling are recycled, the concave positions are filled, the road surface is flattened, and the processed road surface is subjected to secondary detection in the moving process. And the position needing to be finely adjusted is marked,
Bibliography:Application Number: CN202111084774