engineering construction method and equipment
The invention relates to an engineering construction method and equipment. The engineering construction method comprises the following steps: step S1, setting a coordinate point and a distance value between the coordinate point and a base surface of a road to be constructed, detecting an actual dist...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | Chinese English |
Published |
10.12.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to an engineering construction method and equipment. The engineering construction method comprises the following steps: step S1, setting a coordinate point and a distance value between the coordinate point and a base surface of a road to be constructed, detecting an actual distance between the coordinate point and the base surface of the road to be constructed by adopting a range finder, and controlling the range finder to advance on the base surface of the road to be constructed at a set constant speed value; the engineering construction method and equipment are suitable for primary leveling of an uneven road, the equipment detects the actual flatness of the road surface when moving on the road, the convex positions are milled, base materials generated by milling are recycled, the concave positions are filled, the road surface is flattened, and the processed road surface is subjected to secondary detection in the moving process. And the position needing to be finely adjusted is marked, |
---|---|
Bibliography: | Application Number: CN202111084774 |