Method and device for in-situ utilization of TBM rock ballast in tunnel

The invention discloses a method and device for in-situ utilization of TBM rock ballast in a tunnel. The method comprises the steps that rock ballast during excavation of a TBM is collected, rock ballast with the particle size larger than a preset particle size is screened out, the screened rock bal...

Full description

Saved in:
Bibliographic Details
Main Authors FAN JIANSHENG, LI CHAOYI, ZHOU JUNBO, QIN PENGXIANG, PAN CHANGCHENG, ZHOU HU, NIE JIANGUO, JIN FENG
Format Patent
LanguageChinese
English
Published 03.12.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a method and device for in-situ utilization of TBM rock ballast in a tunnel. The method comprises the steps that rock ballast during excavation of a TBM is collected, rock ballast with the particle size larger than a preset particle size is screened out, the screened rock ballast is stored in an in-tunnel stock bin, and the residual rock ballast is transported out of the tunnel; in the excavation and tunneling process, a lining formwork is synchronously installed behind a main machine of the TBM, a stone conveyor is used to backfill the rock ballast in the stock bin into a gap between the surrounding rock and the lining formwork, and a rock block framework for supporting the surrounding rock is formed; and the residual rock ballast is screened into coarse aggregate, fine aggregate and stone powder admixture according to the particle size to serve as a concrete raw material to prepare tunnel ballast self-compacting concrete, the tunnel ballast self-compacting concrete is pumped into a l
Bibliography:Application Number: CN202110832874