High-stress soft rock tunnel bottom plate control method
The invention provides a high-stress soft rock tunnel bottom plate control method. The method comprises the following steps of step 1, establishing a tunnel numerical model to obtain a tunnel bottom plate surrounding rock deformation distribution rule; step 2, quantitatively dividing a bottom plate...
Saved in:
Main Authors | , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
16.11.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a high-stress soft rock tunnel bottom plate control method. The method comprises the following steps of step 1, establishing a tunnel numerical model to obtain a tunnel bottom plate surrounding rock deformation distribution rule; step 2, quantitatively dividing a bottom plate zero displacement curve, a tensile strain range and a bottom plate plastic zone range according to the bottom plate surrounding rock deformation distribution rule; according to the data, determining blasting parameters, anchoring parameters and construction parameters in the blasting pressure relief supporting stage of the bottom plate; step 3, monitoring the damage degree of the bottom plate surrounding rock and surrounding rock stress distribution to obtain bottom plate deformation data; step 4, according to the deformation data of the bottom plate, determining bolt-grouting parameters and grouting opportunity of a secondary bolt-grouting supporting stage; step 5, monitoring the displacement degree of the bottom |
---|---|
Bibliography: | Application Number: CN202111007117 |