Civil engineering pile foundation construction method
The invention discloses a civil engineering pile foundation construction method. According to the civil engineering pile foundation construction method, following machining equipment is adopted, the machining equipment comprises a bottom plate, a collecting device, a pushing device and a connecting...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | Chinese English |
Published |
05.11.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a civil engineering pile foundation construction method. According to the civil engineering pile foundation construction method, following machining equipment is adopted, the machining equipment comprises a bottom plate, a collecting device, a pushing device and a connecting device, the collecting device is installed in the middle of the upper end of the bottom plate and is of a cylindrical structure, the pushing device is installed on the left side of the collecting device, the lower end of the pushing device is installed on the bottom plate, and the connecting device is installed in the collecting device. The civil engineering pile foundation construction method can solve the problems that when existing equipment is used for laying steel sleeves, the laying effect is poor, efficiency is low, large machines are generally needed for hoisting, the machining efficiency of the steel sleeves is affected, meanwhile, when the existing equipment is used for recycling the steel sleeves, the st |
---|---|
Bibliography: | Application Number: CN202110808773 |