Civil engineering pile foundation construction method

The invention discloses a civil engineering pile foundation construction method. According to the civil engineering pile foundation construction method, following machining equipment is adopted, the machining equipment comprises a bottom plate, a collecting device, a pushing device and a connecting...

Full description

Saved in:
Bibliographic Details
Main Author GUO QINGLEI
Format Patent
LanguageChinese
English
Published 05.11.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a civil engineering pile foundation construction method. According to the civil engineering pile foundation construction method, following machining equipment is adopted, the machining equipment comprises a bottom plate, a collecting device, a pushing device and a connecting device, the collecting device is installed in the middle of the upper end of the bottom plate and is of a cylindrical structure, the pushing device is installed on the left side of the collecting device, the lower end of the pushing device is installed on the bottom plate, and the connecting device is installed in the collecting device. The civil engineering pile foundation construction method can solve the problems that when existing equipment is used for laying steel sleeves, the laying effect is poor, efficiency is low, large machines are generally needed for hoisting, the machining efficiency of the steel sleeves is affected, meanwhile, when the existing equipment is used for recycling the steel sleeves, the st
Bibliography:Application Number: CN202110808773