Fabricated building design and construction integrated decision optimization method and system based on BIM

The invention relates to a BIM-based fabricated building design and construction integrated decision optimization method and system, and the method comprises the following steps: completing the structural design and splitting based on a BIM building model, obtaining the basic information of each spl...

Full description

Saved in:
Bibliographic Details
Main Authors CHEN GANG, HUANG JIZHUO, CAO ZHENYUAN, YAN DONGSHENG, WU WUXUAN, CHEN FENG, YANG JIANJUN
Format Patent
LanguageChinese
English
Published 29.10.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a BIM-based fabricated building design and construction integrated decision optimization method and system, and the method comprises the following steps: completing the structural design and splitting based on a BIM building model, obtaining the basic information of each split component, and obtaining the complete information of each split component according to a BIM component library; inputting, by a decision maker, the decision demand information according to demands, automatically imports objective related information, and storing the decision demand information and the objective related information to an information base; establishing a target function library, a constraint function library and an algorithm library; according to the type of decision demand information input by a decision maker, automatically selecting an objective function and a constraint function from an objective function library and a constraint function library to form a mathematical model, automatically mat
Bibliography:Application Number: CN202110711220