Multi-energy complementary base wind-solar-fire storage construction time sequence optimization method and system
The invention discloses a multi-energy complementary base wind-solar-thermal storage construction time sequence optimization method and system. The method comprises the following steps: obtaining a construction time sequence scheme combination of a wind power plant, a photovoltaic power station, a t...
Saved in:
Main Authors | , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
26.10.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a multi-energy complementary base wind-solar-thermal storage construction time sequence optimization method and system. The method comprises the following steps: obtaining a construction time sequence scheme combination of a wind power plant, a photovoltaic power station, a thermal power plant and an energy storage power station; calculating optimization indexes corresponding to the construction time sequence scheme combination respectively, and obtaining effective optimization indexes through constraint condition judgment; comparing to obtain a maximum effective optimization index; and outputting a construction time sequence scheme combination corresponding to the maximum effective optimization index as an optimal scheme. According to the time sequence optimization method and system for construction of the wind-light-fire-storage integrated base, when reasonable distribution of investment resources in unit time is guaranteed, it is guaranteed that the construction cost and the constru |
---|---|
Bibliography: | Application Number: CN202110820006 |