Plateau area power iron tower foundation construction method
The invention discloses a plateau area power iron tower foundation construction method, and belongs to the technical field of power construction. The method can solve the problems of great damage to vegetation in a construction area, large construction amount, inconvenience in construction, time and...
Saved in:
Main Authors | , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
22.10.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a plateau area power iron tower foundation construction method, and belongs to the technical field of power construction. The method can solve the problems of great damage to vegetation in a construction area, large construction amount, inconvenience in construction, time and labor waste, low construction efficiency and labor and material waste of a traditional foundation construction method. The method comprises the steps of construction plane arrangement, material stacking, topsoil and spoil treatment, manual foundation pit excavation, fore shaft and retaining wall pouring, reinforcement cage manufacturing, foundation pouring, vegetation recovery, foundation cap manufacturing and foundation maintenance. The method completely adapts to environmental conditions of plateau areas such as Sichuan and Tibet, and is beneficial to energy conservation and environmental protection; the damage to the plateau environment is greatly reduced; and the foundation quality is ensured, and the construc |
---|---|
Bibliography: | Application Number: CN202110820355 |