Method and device for predicting storage of mainframe after production

The invention provides a method and device for predicting the storage capacity of a mainframe after production, and relates to the field of finance. The method comprises the steps: determining storage information statistical time points before and after a production drill of the mainframe according...

Full description

Saved in:
Bibliographic Details
Main Authors ZHU ZHONGYI, CUI DONGXIAO, ZHAI WENQIAN
Format Patent
LanguageChinese
English
Published 08.10.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a method and device for predicting the storage capacity of a mainframe after production, and relates to the field of finance. The method comprises the steps: determining storage information statistical time points before and after a production drill of the mainframe according to the production drill time of the mainframe; according to the determined storage information statistical time points before and after the production drill of the mainframe, collecting storage data information before and after the production drill of the mainframe; generating storage capacity prediction data after the mainframe is put into production according to the collected storage data information before and after the mainframe is put into production drill and the environment parameters of the mainframe after the mainframe is put into production. By analyzing and comparing the capacity conditions before and after the production drill of the test environment, the performance capacity risk possibly occurring aft
Bibliography:Application Number: CN202110860419