Method and device for predicting storage of mainframe after production
The invention provides a method and device for predicting the storage capacity of a mainframe after production, and relates to the field of finance. The method comprises the steps: determining storage information statistical time points before and after a production drill of the mainframe according...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
08.10.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a method and device for predicting the storage capacity of a mainframe after production, and relates to the field of finance. The method comprises the steps: determining storage information statistical time points before and after a production drill of the mainframe according to the production drill time of the mainframe; according to the determined storage information statistical time points before and after the production drill of the mainframe, collecting storage data information before and after the production drill of the mainframe; generating storage capacity prediction data after the mainframe is put into production according to the collected storage data information before and after the mainframe is put into production drill and the environment parameters of the mainframe after the mainframe is put into production. By analyzing and comparing the capacity conditions before and after the production drill of the test environment, the performance capacity risk possibly occurring aft |
---|---|
Bibliography: | Application Number: CN202110860419 |